Creating the surface of Pond 1

Title: Creating the surface of Pond 1

Pond 1 surface construction involved covering it with a layer of soil 50 cm deep. About 65,000 truckloads of soil were used.
sustainable development, fort mcmurray, oil sands reclamation, oil sands project, wapisiw look out
4282 px width by 1340 px height
300 x 159
4,253.00 KB

Download Options

JPEG 100% JPEG 50% JPEG 25%

Rat root grown from seed

Suncor Energy collected rat root seeds from a nearby marsh and grew them in a greenhouse for planting on the marsh on Pond 1.