Photos

Photo Search


matching images found: 74

Suncor Energy's Pond 1 in 2002

Pond 1 operated from 1967 to 1997. Dykes were built to create a wider and deeper basin until eventually pond was lifted about 100 metres above the Athabasca River.

Mackay River In Situ Project

The MacKay River project is located 60 km northwest of Fort McMurray, Alberta. Increased in situ production is a key part of Suncor’s plans to increase bitumen supply while reducing costs and impact on the environment.

Mackay River In Situ Project

The MacKay River project is located 60 km northwest of Fort McMurray, Alberta. Increased in situ production is a key part of Suncor’s plans to increase bitumen supply while

Edmonton Refinery

Suncor’s refinery is located in Edmonton, Alberta. With a capacity of 142,000 barrels per day, the refinery runs entirely on oil sands-based feedstocks and produces a high yield of light oils.

Oil Sands open pit mining

Loading huge 240 to 380 tonne trucks using shovels with buckets that hold 100 tonnes, the mine delivers about 500,000 tonnes of oil sand per day to the ore preparation plants.

Suncor Energy's Pond 1 in August 2010

In time, we expect this land will become a productive mixed wood forest and wetland environment.

Edmonton Refinery

Located in Edmonton, Alberta, Suncor’s refinery has a capacity of 142,000 barrels per day; it runs entirely on oil sands-based feedstocks and produces a high yield of light oils.

Edmonton Refinery

Suncor’s refinery is located in Edmonton, Alberta. With a capacity of 142,000 barrels per day, the refinery runs entirely on oil sands-based feedstocks and produces a high yield of light oils.