Mackay River In Situ Project

Title: Mackay River In Situ Project

Description
The MacKay River project is located 60 km northwest of Fort McMurray, Alberta. Increased in situ production is a key part of Suncor’s plans to increase bitumen supply while reducing costs and impact on the environment.
Keywords
Mackay River, in situ, oil sands, pipelines, grey sky, landscape
Dimensions
1807 px width by 1200 px height
Resolution
300 x 199
Size
802.00 KB

Download Options

Full Resolution TIFF JPEG 100% JPEG 50% JPEG 25%

Wapisiw reclamation site in the oil sands

Suncor is the first Alberta oil sands company to convert a tailings pond to a stable surface solid enough to be re-vegetated.

Fort Hills mining electric shovel

An electric shovel at the Fort Hills site (2016).

Fort Hills mining trucks

A hydraulic shovel places overburden in a haul truck at the Fort Hills site. When operational, shovels will collect bitumen for haul trucks to take the product to the ore preparation plant (2016).

Burrard Product Terminal in British Columbia

The Burrard Products Terminal straddles the Burnaby-Port Coquitlam border in British Columbia.