Fort Hills mining electric shovel

Fort Hills

Title: Fort Hills mining electric shovel

Description
An electric shovel at the Fort Hills site (2016).
Keywords
Fort Hills, mining, excavator, electric shovel, oil sands
Dimensions
2048 px width by 1496 px height
Resolution
300 x 224
Size
3,007.00 KB

Download Options

Full Resolution TIFF JPEG 100% JPEG 50% JPEG 25%

Enbridge/Suncor tank in the oil sands

Suncor product tanks store refinery-ready feedstock and diesel fuel that is shipped by pipeline to customers and commercial and industrial markets throughout North America.

Extraction separation cell

Suncor's primary extraction plants separate raw bitumen from the sand in giant separation cells.

Mackay River In Situ Project

The MacKay River project is located 60 km northwest of Fort McMurray, Alberta. Increased in situ production is a key part of Suncor’s plans to increase bitumen supply while reducing costs and impact on the environment.

Firebag SAGD well pad 1

Suncor's in-situ project is located on leases known as "Firebag". The Steam Assisted Gravity Drainage (SAGD) technology uses underground wells to inject steam into the oil

Wapisiw reclamation site in the oil sands

Suncor is the first Alberta oil sands company to convert a tailings pond to a stable surface solid enough to be re-vegetated.

Burrard Product Terminal in British Columbia

The Burrard Products Terminal straddles the Burnaby-Port Coquitlam border in British Columbia.